Version | 1 |
Created | 12/31/2015 20:37 |
Last Updated | Never |
ZSE LOA 2003-ZLC01
KZSE - KZLC Letter of Agreement Version 2014
Effective: 01JAN2003
Amended: 10FEB2014
Cancellation: All previous agreements are cancelled.
Letter of Agreement: Seattle ARTCC (KZSE) and Salt lake ARTCC (KZLC)
1.PURPOSE:
This Letter of Agreement (LOA) outlines procedures to be used by Salt Lake City Center (ZLC) and Seattle Center (ZSE).
2.ROLES AND RESPONSIBILITIES:
The Offices of Primary Responsibility (OPR) for this LOA are the ZSE Facility Advisory Board and the ZLC Facility Advisory Board.
This LOA is intended for use by controllers staffing ZLC and ZSE positions.
This LOA, when in effect, shall supersede any and all previous LOA's between ZLC and ZSE. This LOA outlines procedures for handoffs and routings between the respective centers. This LOA establishes "arrival fixes" through which traffic will be routed, to establish consistent traffic flows between the ARTCCs.
5a. General Handoff Procedures:
Unless otherwise coordinated, the following Handoff procedures shall apply:
5a.1- General Handoff Procedures shall be in accordance with current VATSIM and VATUSA policies.
5a.2- When Sectorized, handoffs to ZSE are to:
5a.3- When Sectorized, Handoffs to ZLC are to:
5b. Procedures and Responsibilities:
5b.1- The following table outlines arrival routing from ZLC to ZSE.
ZLC shall ensure all traffic bound for the listed destinations from the departure area is cleared via a route that includes the corresponding route segment:
Destination |
Departure Area |
Route Segment |
Altitude |
KSEA |
All |
MLP.GLASR9 |
n/a |
KSEA |
KSLC |
PDT.CHINS9 |
n/a |
KGEG |
All |
MLP.HILIE2 |
At Handoff - FL280 or below. |
KPDX |
All |
HHOOD2 |
n/a |
5c. Arrival Procedures:
5c.1- The following table outlines arrival routing from ZSE to ZLC.
ZSE shall ensure all traffic bound for the listed destinations from the departure area is cleared via a route that includes the corresponding route segment, and ensure the aircraft are at the altitude listed prior to crossing the common ZSE/ZLC boundary.
Destination |
Departure Area |
Route Segment |
Altitude |
KMSO |
All |
MLP.MSO, MQG.MSO, PUW.MSO, COE.MSO |
At Handoff – 17000 or below |
KGPI |
All |
MLP.FCA COE.FCA |
At Handoff – 17000 or below |
KBKE |
All |
IMB.BKE PDT.BKE ALW.BKE MQG.BKE |
At Handoff - 12000 or below. |
KSLC | All |
BOI.BYI SKEES3 or BOI.BYI BEARR4 |
n/a |
5d. Departure Procedures:
5d.1- It is not necessary for ZLC to Approval Request Glacier Park (KGPI;FCA) and Missoula (MSO) westbound departures.
END
LOA Proposed by: Warren Huckaby - ZSE DATM - 11 FEB 2014
LOA Approved by ZSE ATM/DATM: Tony Jeppesen - ZSE ATM - 15 FEB 2014
LOA Approved by ZLC ATM/DATM: Scott DeWoody - ZLC ATM - 16 FEB 2014
LOA Approved by Western Director: Mark Hubbert - VATUSA7 -